Commercial • St Paul's Cray, Orpington

uPVC windows and an aluminium door, Midfield Primary School

Midfield Primary School is in St Paul's Cray, on the edge of Orpington. We replaced eight classroom windows and an external door over the October half term in 2026, and it was finished in time for the children coming back.

The aluminium double door square on, glazed above and below the mid rail, with the two pane toplight over it.
Windows 8 Liniar uPVC casements, white
Door 1 aluminium double door, white
Openers Teleflex remote openers at high level
Completed October 2026 half term

The work came to us through the main contractor running the project at the school. Our part was the glazing: eight white Liniar uPVC casement windows in the classrooms, and a white aluminium double door with a toplight, taking a classroom straight out onto the playground.

A primary school is empty for one week at October half term, and that week was the programme. The windows and the door were made before the holiday started, so the time on site went on fitting them, and the classrooms were ready when the children came back. This was the first phase of the work at the school, with the second due to start a few weeks later.

The windows have top-hung openers. Where an opener sits high in the frame, out of reach from the floor, it is worked by a remote opener: a cable runs along the transom from the opener to a control on the wall beside the window, so a teacher can open it from where they stand. The trade calls them Teleflex.

The door is a pair of white aluminium leaves under a two pane toplight, glazed above and below a solid mid rail, with pull handles at the meeting stiles. It is the classroom's way out onto the playground, so it is opened and closed by a whole class at a time, every day of term.