School and education glazing

Window, door and curtain walling replacement for schools, academies and colleges, planned around the school year rather than against it.

Aluminium window fitted into a school elevation

Scope of works

Most school glazing is decided by the calendar before it is decided by the specification.

A school is only empty for a few weeks a year, and those weeks are when almost every other trade wants to be on site too. The specification usually turns out to be the easy part. What decides the job is how much of it can be finished before the pupils come back.

We have worked on school sites including Shaftesbury School, Witchford Village College, Merchant Taylor and Leagrave SEN. Send us the elevations and the term dates together, because we cannot price the second one out of the first.

Specification

School and education glazing, to your specification.

Restrictors
Fitted to the limit your own risk assessment sets, consistent across the site.
Safety glass
Toughened or laminated where the opening needs it, specified per elevation.
Safeguarding
DBS-checked operatives and site induction where the school requires it.
Fire rating
Fire-rated glazing supplied to the rating the specification calls for.
Programme
Phased by block or by holiday, sequenced against your term dates.

Every figure published here is one we can stand behind. Ask us for anything the table does not cover and we will send it to you in writing.

Scope

What we take on across a school estate.

01

Classroom windows

Replacement windows in teaching spaces, with restrictors and safety glass where the opening needs them.

02

Entrances and screens

Glazed entrance screens and doors, coordinated with access control where the school already has it.

03

Curtain walling

Larger glazed elevations on halls, atria and newer teaching blocks.

04

Phased programmes

Work split by block or by holiday so the school keeps running around it.

Window installation in progress on a school building

Working around a live school

The awkward part is not the glazing, it is the safeguarding.

On an occupied school site the route from the compound to the elevation matters as much as the elevation. Pupil separation, signing in, supervised access and where the skip goes all get agreed before we start rather than argued about on day one.

  • Segregated working areas
  • Site induction and sign-in
  • Agreed access and storage
Glazed run installed in a school block

What to send us

Term dates are part of the specification.

Elevations, a window schedule and the dates the school is empty are enough to start. If the work has to happen in term time we will say so, and we will tell you what realistically fits into a holiday rather than promising the lot and running over into September.

  • Elevations and schedule
  • Term and holiday dates
  • Access constraints on site

Common settings

Education settings we work in.

Survey, access and the existing building decide the final route. These are the settings this work usually goes into.

Primary schools Secondary schools Academies Sixth form and colleges SEN settings Teaching blocks

Common questions

School and education glazing, asked and answered.

Can the work be done in the school holidays?

Programmes are phased by block or by holiday and sequenced against your term dates. Send us the elevations and the term dates together, because we cannot price the second one out of the first.

Are your operatives DBS checked?

Yes. DBS-checked operatives, and site induction where the school requires it.

What restrictors do you fit to classroom windows?

Restrictors fitted to the limit your own risk assessment sets, kept consistent across the site, with toughened or laminated safety glass specified per elevation where the opening needs it.

Have you worked on school sites before?

Yes, including Shaftesbury School, Witchford Village College, Merchant Taylor and Leagrave SEN.

What we can put on a pre-qualification questionnaire.

  • Constructionline Gold Pre-qualified for public and private sector tendering.
  • SSIP accredited Health and safety assessed under the Safety Schemes in Procurement umbrella.
  • DBS-checked operatives For schools, care settings and any site where the check is a condition of access.

Commercial enquiry

Send us the school and education glazing brief.

Drawings, a window schedule, elevations or site photographs are all useful, and none of them is required. A postcode and a description of the building is enough to get a sensible answer back.

Project enquiry Tell us the basics.

A few useful details are enough. We confirm the exact specification after survey.

Your contact details
How should we reply?
A few project details